Last updated 26 November 2026
Plan around manufacture time rather than expecting stock items
Replacement windows and doors are built to the exact sizes of your openings, so there is always a gap between saying yes and seeing them fitted. Understanding the stages in that gap helps you plan around holidays, decorating or a house sale. This guide explains what happens behind the scenes and what tends to make the wait shorter or longer.
At a glance
- Why made-to-measure products are not instant
- The stages between order and fitting
- Choices that can lengthen the wait
Why made-to-measure products are not instant
Unlike a boxed item from a builders' merchant, a replacement window or door is manufactured for one opening. Frames are cut and welded to size, glass units are made to fit them, hardware is added and colours or foils are applied. Each step relies on accurate sizes, which is why the process starts with measuring rather than ordering from a catalogue.
The upside is that the finished product suits your opening, style and colour choices exactly. The trade-off is time. Treat any quoted lead time as an estimate that depends on the product and the season, and ask for a realistic timescale when you receive your quotation rather than assuming a fixed number of days.
The stages between order and fitting
Most projects follow the same broad sequence. After the survey and quotation, you confirm the order. Sizes may be checked again before anything is made, so there are no surprises. The order then goes into manufacture, where frames, glass and doors are produced. Finally the products are delivered and an installation date is arranged.
Each stage can be quick or slow depending on what you have chosen. A standard white casement window moves through manufacture differently from a coloured composite door with decorative glass. Knowing which stage your order is at makes it easier to understand any updates you receive and to plan around the likely fitting date.
Choices that can lengthen the wait
Colours, finishes and special glass are the usual reasons for a longer lead time. Woodgrain foils, dual colours with a different shade inside and out, bespoke door designs, unusual shapes such as arched heads, and specialist glass like acoustic or patterned units all add steps. None of these is a reason to avoid your preferred choice, but they are worth factoring into your plans.
Composite doors can have their own timescale, as the door slab, frame, glass design and furniture come together. Large bi-fold or French door sets may also take longer than standard windows. If timing is important, ask at the survey which of your choices are likely to affect the schedule, and whether any alternatives would be quicker.
Seasonal demand
Demand for windows and doors tends to rise before winter, when homeowners notice draughts and cold rooms, and again in spring and summer when outdoor projects are planned. Busy periods can affect both manufacturing and installation calendars. Ordering a little ahead of the season you want the work done in gives more choice of fitting dates.
Fitting itself can happen year round. Our guide on whether windows can be fitted in winter explains how openings are kept protected during cold weather. Even so, if you have a fixed deadline, such as a family event or a completion date, raise it early so everyone is planning with the same date in mind.
Fitting your project around other work
If you are also plastering, rewiring, laying floors or redecorating, the order of jobs matters. Windows are usually fitted before final plastering and painting, so the reveals can be finished afterwards. New doors may need floor heights confirmed first, particularly where a new floor will raise the level at the threshold.
Talk to any other trades about the expected window and door date and leave a little slack in the plan. A small delay in manufacture or weather on fitting day should not leave a plasterer or decorator waiting. Our guide to replacing windows in stages covers how to break larger projects into manageable phases.
Keeping track of your order
Once the order is confirmed, keep a copy of the quotation and the specification. If you are told a date for delivery or installation, write it down along with any instructions about access or preparation. If anything about your plans changes, such as a holiday or building work, let the company know as soon as possible.
It is reasonable to ask for an update if a date passes without word. A short call usually clears up where the order is. Avoid changing the specification once manufacture has started, because altering sizes, colours or glass at that point can mean starting the item again and pushing the fitting date back.
Preparing for the installation date
As the fitting date approaches, clear the area inside each window and door, take down blinds and curtains, and make sure there is access outside for the installers. Arrange for pets and children to be kept away from the working area. Our guide to preparing your home for window installation lists the practical steps in more detail.
If you are having doors fitted, think about how you will get in and out during the day and whether you need a spare key arrangement for anyone arriving later. The doors page shows the range we offer, and a free survey is the starting point for an accurate timescale for your own project.
Sources and further reading
Discuss your home with County Windows
Explore our doors or request a quotation for your property. Explain your priorities and the condition of the existing openings so the survey can establish an appropriate specification.

